Knowledge Base
Fire Compliance Knowledge Base
Plain-English guidance on fire block plans, Australian Standards and building compliance.
7 May 2026
Fire Control Room Requirements: What Goes Inside
The fire control room is mission control for an incident. Here's what it's for and what documentation belongs inside.
Read article
30 Apr 2026
Block Plan vs Hydraulic Drawing: What's the Difference?
A common point of confusion: block plans and hydraulic drawings serve very different purposes. Here's how they differ.
Read article
23 Apr 2026
What Is EWIS? Emergency Warning Systems Explained
A plain-English explanation of EWIS — what it is, how it supports staged evacuation, and why it needs clear documentation.
Read article
16 Apr 2026
Hospital Fire Safety Documentation Requirements
Why hospitals are among the most demanding buildings to document, and what coordinated fire documentation involves.
Read article
9 Apr 2026
Childcare Centre Fire Safety Documentation Requirements
Why childcare centres need exceptionally clear evacuation documentation, and what compliance involves.
Read article
2 Apr 2026
Sprinkler Hazard Classifications Explained
What light, ordinary and high hazard mean for sprinkler design, and why your building's classification must match its actual use.
Read article
26 Mar 2026
Hydrant Flow Rates Explained
What hydrant flow and pressure requirements mean, why they matter to firefighting, and how they relate to your documentation.
Read article
19 Mar 2026
Annual Fire Safety Statement Requirements in NSW
What the annual fire safety statement involves in NSW, and how block plans, evacuation diagrams and baseline data support it.
Read article
12 Mar 2026
How to Update Existing Block Plans
Buildings change constantly. Here's when your block plans need updating and how the process works for existing buildings.
Read article
5 Mar 2026
Fire Brigade Expectations for Block Plans
What fire and rescue crews actually need from your block plan when they step off the truck — and how to design for it.
Read article
26 Feb 2026
Common Fire Block Plan Defects (and How to Avoid Them)
The defects that most often get fire block plans flagged at audit, and the engineering practices that prevent them.
Read article
19 Feb 2026
AS 1670 Zone Block Plan Requirements
How AS 1670.1 shapes the zone block plan at the Fire Indicator Panel, and why panel, mimic and plan must always agree.
Read article
12 Feb 2026
What Is Baseline Data Under AS 1851?
Baseline data is becoming a major compliance issue for existing buildings. Here's what it is, why it matters under AS 1851, and how to recover it.
Read article
5 Feb 2026
AS 3745 Evacuation Diagram Requirements
Everything a compliant AS 3745 evacuation diagram must include — and how often they need to be reviewed.
Read article
29 Jan 2026
AS 2118 Sprinkler Block Plan Requirements
What AS 2118 says about sprinkler system documentation and how to produce compliant block plans.
Read article
22 Jan 2026
AS 2419 Hydrant Block Plan Requirements
What AS 2419.1 actually requires on a hydrant block plan and where it must be displayed.
Read article
15 Jan 2026
What Is a Fire Block Plan?
The definitive guide to fire block plans in Australia — what they are, why they matter, and who needs them.
Read article
8 Jan 2026
How Much Does a Fire Block Plan Cost in Australia?
Understand what drives the cost of fire block plans, from building complexity and system type to site access and documentation condition.
Read article
2 Jan 2026
Fire Block Plan vs Evacuation Diagram: What's the Difference?
Fire block plans and evacuation diagrams both support emergency response, but they serve very different purposes. Here's how to tell them apart.
Read article
26 Dec 2025
Why Existing Buildings Need Updated Fire Block Plans
Older buildings often have missing, outdated or inaccurate fire block plans. Here's why reconstruction and updates matter for compliance and safety.
Read article
19 Dec 2025
How to Reconstruct a Fire Block Plan When Drawings Are Missing
When original fire system drawings are lost, engineers can reconstruct compliant block plans from a physical site survey. Here's how the process works.
Read article
