Projects & Case Studies
Real, engineering-led fire compliance work — see how we solve the hard jobs.
High-Rise Residential Strata
Reconstructing Hydrant Block Plans for a High-Rise Strata Tower
A 30-storey residential tower with no usable hydrant documentation needed compliant block plans before its annual fire safety statement. We reconstructed the system from scratch.
Read case study
Logistics / Warehouse
Sprinkler Block Plans for a Re-Racked Distribution Warehouse
A distribution centre changed its racking and storage height, putting its sprinkler documentation out of step with the installed system and its hazard classification.
Read case study
Healthcare / Hospital
Reconciling Fire Alarm Zone Plans Across a Hospital Campus
A hospital's Fire Indicator Panel, mimic and zone block plans had drifted out of agreement after years of staged detection upgrades.
Read case study
Early Childhood Education
Evacuation Diagrams for a Multi-Room Childcare Centre
A childcare centre needed updated evacuation diagrams that reflected their specific operational requirements for supervising young children during an emergency.
Read case study
Commercial Office
Establishing Baseline Data for a Commercial Tower
A commercial office tower had never had formal baseline data established for its fire systems, making meaningful AS 1851 maintenance impossible.
Read case study
Existing Building / Reconstruction
Reconstructing Fire Hydrant Block Plans for an Existing Office Building
A 1980s office building had no usable hydrant documentation. We traced the entire system on site and rebuilt compliant block plans from scratch.
Read case study
Existing Building / Reconstruction
Rebuilding Sprinkler Block Plans After Warehouse Re-Racking
A warehouse changed its racking layout and storage height without updating its sprinkler documentation. We reconstructed the system and corrected the hazard classification.
Read case study